Implementation and Management Approach
The project consists of 7 Work packages:
Work package 1 (WP1)
The general objective of work package 1 is the adaptation of existing psychological treatments aimed at different phases of (the treatment of) depression in such a way that they can be used as self-administered treatments through the internet and mobile phones. These psychological treatments can be applied consecutively in the treatment of depression in primary care patients. The basic principles of the treatments will be identified and described (to be used for the computational assessment in WP3) and the interactions options with the patient will be described (both input from the patient as well as feedback to the patient). These specifications will be used to describe one or more usage scenarios for the system that makes clear how a patient and caregiver would interact with the system.
Work package 2 (WP 2)
In work package 2 the biomedical sensors, medicine intake monitors as well as mobile phone application will be developed for progression monitoring of the patient. In addition, an objective is the interpretation of this information such that useful information is obtained to measure the progress of therapy.
Specific objectives
- Task 2.1: Develop techniques to measure on a real time basis whether medicine has been taken, in addition, algorithms will be developed which analyse this information, and translate it to information which can be used for progress of therapy.
- Task 2.2: The development of techniques to measure activities being conducted using a mobile phone. Hereby, sensing devices in the form of accelerometers as well as questionnaires will be developed suitable for deployment on the cell phone. Furthermore analysis methods which translate this information to a more abstract level will be developed.
- Task 2.3: In task 3 the objective is to develop non-intrusive biomedical sensors, and algorithms which translate this information to information on such a level that it can be used to measure progress of therapy.
- Task 4: In task 4 the objective is to integrate the three measuring devices and validate the approaches that have been developed.
Work package 3 (WP 3)
The overall objective of the work package is to interpret the information which has been received from the sensors, and give appropriate feedback to both the patient as well as the caretaker. This not only includes sending messages based upon progress of therapy, but also the selection of the therapy. This makes the system much more flexible, and enables the patient to follow the most appropriate therapy given the behaviour observed by the system.
Work package 3 has resulted in two public deliverables so far.
Work package 4 (WP 4)
The main objective of work package 4 is to create the overall architecture of the ICT4Depression depression support system. This involves the integration of the methods developed in WP3 and WP4, and the deployment of the overall system in the primary care.
Work package 5 (WP 5)
The general objective of WP5 is to test the system with actual users. This will be done in two phases: first, a short pilot study will be conducted to test the technical setup and tune the system towards the human users; second, we will conduct a study in which the feasibility of the ICT4Depression self-management system - in terms of process and clinical effectiveness- is examined, as part of the treatment of people with a depression within primary care. We will apply a pre-test- post-test design and 100 participants will be recruited among primary care patients of general practitioners both in the Netherlands (50) and Sweden (50). Questionnaires will be administered with patients who use the ICT4Depression self-management system as part of their treatment for depression in primary care, before the start of the treatment, as well as 3 months after treatment.
Work package 6 (WP 6)
Dissemination of the output of the ICT4Depression consortium and the exploitation of the activities and the results obtained.
Work package 7 (WP 7)
Smooth management of the project to ensure cohesion and compliance with the Project Plan as presented here.